ASC was responsible for supporting the Project's lead engineering firm with project closeout activities, final acceptance documentation, and system modifications. ASC is also the project manager for the ITS portion of two I-75/I-595 ramp modifications to connect the I-595 and I-75 Express Lanes Projects.

ASC was responsible for construction and inspection project management for a system-wide deployment of Dynamic Message Signs on MDX's five roadways. 

ASC was responsible for implementation of critical tunnel systems including: ITS/SCADA systems, tunnel electrical systems, tunnel fire alarm systems, and tunnel lighting systems. ASC also supported other project disciplines with constructability reviews and shop drawing/design development including: Civil Construction, Site Grounding, and Building Services.

EAST VENETIAN BASCULE BRIDGE REHABILTATION

PORTMIAMI TUNNEL DESIGN-BUILD

PROJECTS

Copyright © ASC Logic. All rights reserved.

ASC was responsible for design and testing oversight of the replacement of critical bridge electrical systems, including drive motors, vector motor drives, the motor control center, control console, position sensors, limit switches, motor disconnects, and the conduit system.

I-595 EXPRESS LANES PROJECT

MIAMI-DADE EXPRESSWAY GENERAL ENGINEERING CONSULTANT